Al Shabab EPC for Demi Water Production

Al Shabab - Egypt

Client: East Delta Electrical Company
 

Turnkey Design, Construction, Supervision of Erection, commissioning and Start Up for Al Shabab Service Water and Demineralized Water Production Plant, Industrial Waste Neutralization and Sewage Water Treatment Plant.

Process:
- Pre-treatments,
- Ultrafiltration plant,
- 2 pass 2 steps reverse osmosis plant,
- Mixed bed demineralization.

Capacity:
- UF Water produced: 240 m3/h
- RO Water produced: 155 m3/h
- Mixed beds: 130 m3/h
- Potable water: 30 m3/d