The project consists of the construction of a demineralization plant to produce service water from a power plant’s steam production. The water intake will be made of the Mediterranean Sea near Alexandria. Subject contract consists of the supply and installation of an Electro- chlorination unit for sea water disinfection, pretreatment by means of self-cleaning filters and ultrafiltration units, two steps of reverse osmosis units with energy recovery system and a final EDI (electrode-ionization) for fine ion removal, demineralized water storage tanks, chemicals storage and dosage for membrane cleaning, internal wastewater treatment package plant and sludge treatment.
Demineralization production with UF (Ultra Filtration), RO 1st & 2nd step for total production of 120 m3/h
Demineralization production with UF (Ultra Filtration), RO 1st & 2nd step for total production of 120 m3/h