The Project consists of the Construction of Kütahya Wastewater Treatment Plant.
The Process includes:
- raw water pumping stations
- pretreatments
- primary sedimentation
- activated sludge system with biological nitrogen & phosphorous removal
- final sedimentation
- sludge thickening
- sludge anaerobic digestion
- mechanical sludge dewatering
- sludge lime stabilization
- co-generated heat and power plants.
Capacity: 190,000 m3/d
The Process includes:
- raw water pumping stations
- pretreatments
- primary sedimentation
- activated sludge system with biological nitrogen & phosphorous removal
- final sedimentation
- sludge thickening
- sludge anaerobic digestion
- mechanical sludge dewatering
- sludge lime stabilization
- co-generated heat and power plants.
Capacity: 190,000 m3/d