Turnkey Design, Construction, Supervision of Erection, commissioning and Start Up for Al Shabab Service Water and Demineralized Water Production Plant, Industrial Waste Neutralization and Sewage Water Treatment Plant.
Process:
- Pre-treatments,
- Ultrafiltration plant,
- 2 pass 2 steps reverse osmosis plant,
- Mixed bed demineralization.
Capacity:
- UF Water produced: 240 m3/h
- RO Water produced: 155 m3/h
- Mixed beds: 130 m3/h
- Potable water: 30 m3/d
Process:
- Pre-treatments,
- Ultrafiltration plant,
- 2 pass 2 steps reverse osmosis plant,
- Mixed bed demineralization.
Capacity:
- UF Water produced: 240 m3/h
- RO Water produced: 155 m3/h
- Mixed beds: 130 m3/h
- Potable water: 30 m3/d